Construction Punch List Example: A Walkthrough, Line by Line

An unfinished kitchen in a new construction home showing cabinets with some drawer fronts missing and paint touch up needed near the window trim.

A construction punch list example is easiest to understand as a single walkthrough turned into a report, so here is one, line by line, from photo to final grouping.

What a punch list actually looks like on a real job

A punch list is the list of items to complete or correct before final payment, and on most jobs it is organized by room and by trade so each subcontractor can work their own section without wading through everyone else’s. The example below follows one walkthrough of a single family home near substantial completion, the point where the owner could use the space for its intended purpose if not for these remaining items.

The walkthrough covers the kitchen, a hallway bathroom, and the exterior front elevation. Each line shows what the walker saw, what they noted, and which trade the item lands with.

Kitchen: line by line

  1. 1Cabinet, lower left of sink run: drawer front missing a pull. Trade: cabinetry. Note: hardware was ordered but not installed per the sub.
  2. 2Countertop, right of range: visible seam gap, about 1/16 inch, catching debris. Trade: countertop installer.
  3. 3Wall, above backsplash tile: paint touch up needed where tile setters scraped the finish coat. Trade: painting.
  4. 4Outlet, island side: cover plate crooked, not flush. Trade: electrical.
  5. 5Floor, transition to hallway: quarter round not yet caulked. Trade: finish carpentry.
  6. 6Window, over sink: screen torn in lower corner, about 2 inches. Trade: window supplier or glazier, depending on who holds the warranty on the unit.

Bathroom and exterior: line by line

  1. 1Vanity, hallway bath: faucet drips when handle is in the off position. Trade: plumbing.
  2. 2Tile, shower surround: one corner piece cracked, likely from handling during install. Trade: tile.
  3. 3Door, bathroom entry: does not latch cleanly, strike plate misaligned. Trade: finish carpentry.
  4. 4Exterior, front elevation: downspout not connected to underground drain line. Trade: gutters or landscaping, depending on contract split.
  5. 5Exterior, garage door trim: caulk line incomplete along top edge. Trade: siding or trim carpenter.
  6. 6Exterior, walkway: one paver sitting proud, a trip hazard. Trade: hardscape or concrete.

Why each line needs a photo and a trade, not just a sentence

A one line description like “touch up paint in kitchen” tells a painter almost nothing about where, or how much. A photo with the defect circled, paired with a short spoken note turned into text, removes the guesswork. This is the gap SayScope is built to close: you photograph the defect, circle it on the photo, hold a button and say what is wrong, and the app groups everything by room and by trade automatically. Walkthroughs are free and unlimited, and each account can send one report a week at no cost, which covers a single trip through a property like the one above.

The example list above has twelve items, which fits inside a typical free report’s item cap. A larger property, a commercial build out, or a second report needed later the same week would call for a paid plan instead, since the free tier caps both the report frequency and the number of items per report.

Turning the list into a contract document

Once the list exists, it usually gets attached to a notice to the relevant subs or sent to the owner’s representative as the basis for completing work before the final payment is released. If an item changes the original scope, price, or time, that typically calls for a written, signed change order rather than an informal note on the punch list itself.

Read next

Printable template

Take the template with you

One page, room by room, with a column for the photo number. Print it or keep it on your phone.

We will email you the PDF, then three short notes on getting a punch list taken seriously. Unsubscribe in one click, any time.

Questions people ask

What is a good construction punch list example format?

Most contractors find a format grouped by room, then by trade within each room, easiest to work from. Each line should include a short description, a photo of the defect, and the trade responsible, so no one has to guess what is meant or who owns the fix.

Who makes the punch list on a job?

On most jobs, the general contractor, the owner’s representative, or an architect walks the property and compiles the list, sometimes with input from the owner. Subcontractors then work from their section of the list to clear their own items.

How many items is normal on a punch list?

It depends heavily on project size and finish quality. A single family home nearing completion might have a dozen to several dozen items, while a larger commercial build out can run into the hundreds across all trades.

Does a punch list need photos?

Photos are not a universal requirement, but on most jobs they make the list far more useful, since a circled photo removes ambiguity about location and severity that a text description alone cannot capture.

What happens after the punch list is cleared?

Once items are verified complete, the project typically moves toward final payment, though the exact process, including any final inspection or sign off, depends on what the contract between the parties specifies.