Interim Schedule of Dilapidations: What It Is and Why It Differs

Exterior of a mid term commercial building showing visible disrepair on its facade

An interim schedule of dilapidations is a landlord’s formal list of alleged breaches of the repairing covenant served while the lease is still running, not at its end.

What an interim schedule of dilapidations is

A schedule of dilapidations is a document that sets out alleged breaches of a tenant’s repairing, decorating or reinstatement obligations under a lease. It is normally prepared by a building surveyor acting for the landlord, item by item, often cross referenced to lease clauses and photographs.

An interim schedule is served while the lease is still live, part way through the term, rather than at expiry or on termination. It is sometimes called a mid term schedule for that reason.

Why a landlord serves one mid term

A terminal schedule, served at or near the end of a lease, is backward looking. It records the condition of the premises as the tenant hands them back and forms the basis of a dilapidations claim for damages.

An interim schedule is forward looking. The landlord is putting the tenant on notice during the term, usually so the tenant has the opportunity to carry out repairs while still in occupation, rather than waiting until the end when the only remedy left is a claim for money.

  • Protecting the value and condition of the investment during a long lease
  • Triggering a tenant’s repair obligation before disrepair worsens or spreads
  • Supporting a break clause where conditions attach to the state of repair
  • Creating a paper trail in case the tenant disputes liability later

Why the remedy differs from a terminal schedule

This is the point most worth understanding. At lease end, a landlord’s remedy for disrepair is generally damages, assessed by reference to the diminution in the value of the reversion, subject to the statutory cap that applies to that measure. Specific performance, an order compelling the tenant to actually do the work, is rarely available once the tenant has left.

During the term, the position is different. Many leases include a right of entry allowing the landlord to inspect, and some include a jervis v harris style clause giving the landlord the right to enter, carry out the repairs itself, and recover the cost from the tenant as a debt rather than as damages. Where such a clause exists, an interim schedule is often the first formal step toward exercising it.

In other words, an interim schedule is not just an early version of the terminal one. It sits inside a different remedy structure: specific repair, or a self help and cost recovery route, instead of an end of term damages claim. Whether a particular remedy is actually available depends entirely on what the lease says, so the drafting has to be checked clause by clause rather than assumed.

What a surveyor should check before relying on one

  • Whether the lease grants a right of entry to inspect and serve notice mid term
  • Whether there is a self help or Jervis v Harris clause, and its exact wording
  • The repairing covenant itself, including any exclusions or qualifications
  • Whether a schedule of condition was attached at grant, limiting the repair standard
  • Reinstatement obligations for alterations, which are sometimes dealt with separately from repair

The schedule should itemise each defect, reference the relevant covenant, and where possible include photographic evidence. A well documented visit, whether for the landlord preparing the schedule or the tenant responding to it, makes any later negotiation or dispute easier to resolve.

Documenting the condition

Whichever side of an interim schedule you are on, a clear photographic record of each item helps. An app like SayScope lets you photograph a defect, circle it on the image, and record a short voice note on what is wrong, then export a report grouped by room or by trade. That is useful both for a landlord building the schedule and for a tenant checking it against the actual condition of the premises.

Read next

Questions people ask

What is the difference between an interim and a terminal schedule of dilapidations?

An interim schedule is served during the lease term and is usually aimed at getting repairs done while the tenant is still in occupation. A terminal schedule is served at or near lease end and usually supports a damages claim instead.

Can a landlord force a tenant to repair during the lease term?

Only if the lease gives the landlord that right, typically through a right of entry combined with a self help clause allowing the landlord to do the work and recover the cost. Without such a clause the landlord’s options mid term are more limited.

Does the dilapidations damages cap apply to an interim schedule?

The statutory cap on damages relates to claims at or after lease end. An interim schedule served mid term is typically used to trigger repair or a cost recovery mechanism under the lease, not a damages claim, so the cap is not usually the relevant consideration at that stage.

Who prepares a schedule of dilapidations?

Normally a building surveyor instructed by the landlord, though a tenant will often instruct their own surveyor to review and respond to it.